by Madmin | Dec 11, 2013 | Featured, Gallery Of Work
The directors of a pre-school in Santa Monica commissioned me to build a pair of barn doors to be used as a room divider. They each measured about 6’ x 8’ and were tricky to fabricate in my small garage. The day I needed more space for sanding them prior to finishing...
by Madmin | Dec 11, 2013 | Gallery Of Work
Cabinet Removal – Before Cabinet Removal – After In order to open up the space in an upstairs hall way a customer asked me to remove a low cabinet and replace it with a railing. I was able to find suitable matches for the balusters and newel post...